The following is a list of general highway maintenance and construction work the Missouri Department of Transportation has planned in the Northwest Missouri region for the week of August 31-September 6.
There may be moving operations, such as mowing, brush cutting and litter removal, throughout the region in addition to the work mentioned below. Inclement weather may cause schedule changes in some of the planned work. Check the MoDOT Traveler Information Map, or download the app for updated information.
MoDOT asks drivers to work with them by buckling up, putting your phone down, slowing down and moving over in work zones.
Andrew County
Interstate 29 – Bridge maintenance northbound at the bridge over Route DD (55.2 mile marker), Aug. 31-Sept. 4. The bridge will be narrowed to one lane around-the-clock with a 12-foot width restriction.
Atchison County
U.S. Route 136 – Resurfacing project from I-29 to U.S. Route 71 through early Sept. 2026. The road will be narrowed to one lane, with a 10-foot width restriction.
U.S. Route 136 – Bridge maintenance at the bridge over Interstate 29, Aug. 31-Sept. 4. The bridge will be narrowed to one lane around-the-clock with temporary traffic signals and a 14-foot width restriction.
Buchanan County
U.S. Route 59/Route 752/Route U – Intersection improvement project through spring 2027.
I-29 – Resurfacing project from Pigeon Creek (mile marker 39.8) to the Platte County line (mile marker 31) through mid-October 2026. The road will be narrowed to one lane overnight between 6 p.m. and 7 a.m. with an 11-foot width restriction.
Route 6 – Bridge maintenance at the bridge over the One Hundred and Two River, Aug. 31-Sept. 3.
Route AC – Bridge maintenance at the bridge over Easton Road, Aug. 31-Sept. 3.
Clinton County
I-35 – Pavement rehabilitation in the southbound lanes from Exit 40 (Lathrop) to Exit 48 (south Cameron) through September 2026. The north- and southbound inside (passing) lanes may experience short-term closures while crews remove crossovers.
DeKalb County
U.S. Route 36 – Intersection improvement project at Bob F. Griffin Road, through November 2026. Route 36 will be narrowed to one lane, with an 11-foot width restriction. There are no right turns from northbound Bob Griffin Road to eastbound Route 36 or from southbound Bob Griffin Road to westbound Route 36.
Gentry County
Route P – Resurfacing project through early Sept. 2026. The roadway may be CLOSED or narrowed to one lane with flaggers.
Nodaway County
U.S. Route 71 – Intersection improvement project at 340th Street through early November 2026.
U.S. Route 71 – Resurfacing project from the Iowa state line to U.S. Route 136 near Burlington Junction through early Sept. 2026. The road will be narrowed to one lane, and a 10-foot width restriction will be in place.
U.S. Route 136 – Resurfacing project from I-29 to U.S. Route 71 through early Sept.2026. The road will be narrowed to one lane, and a 10-foot width restriction will be in place.
U.S. Route 46 – Resurfacing project from U.S. Route 59 (Atchison County) to Nodaway River from Aug. 26 through November 2026. The road will be narrowed to one lane, and a 10-foot width restriction will be in place.
Route E – Resurfacing project from the Iowa state line to U.S. Route 136 through November 2026. The road will be narrowed to one lane, with a 10-foot width restriction in place.
Route VV – CLOSED for a deck replacement project at the Platte River Bridge through December 2026.
Route YY – CLOSED for pavement repair from 160th Street to 170th Street, Aug. 31-Sept. 4. 7 a.m. to 3 p.m. daily.
Worth County
Route A – Pothole patching, Aug. 31.
Route W – Pothole patching from Route Z to Route B, Sept. 1-2.
Route B – Pothole patching from Route W to U.S. Route 46, Sept. 3-4.







